Lp |
Normatyw |
Opis |
Suma |
1. |
Element: STOLARKA OKIENNA |
|
1. 1. |
KNR
04-01-0535-0800 |
Rozebranie obrób. blach. okap. z bl. n/nadaj. się do użytku. SST 03.02
|
|
I p., pom. 1/1 1/2 do 1/5, 1/6 do 1/9
(1.04+(2.57*8))*0.20
|
4.32
|
Jm. m2 |
Razem: |
4.32 |
1. 2. |
KNR
04-01-0354-1200 |
Wykucie z muru podokien. beton. i z lastryko. SST 03.02
|
|
Ip., pom. 1/1, 1/2 do 1/9
1.12+(2.67*8)
|
22.48
|
Jm. m |
Razem: |
22.48 |
1. 3. |
KNR
04-01-0354-0400 |
Wykucie z muru ościeżnic drewn. o pow. do 2 m2. SST 02.01
|
|
Okna: Ip. pom. 1/1, 1/9
2.00
|
2.00
|
Jm. szt. |
Razem: |
2.00 |
1. 4. |
KNR
04-01-0354-0500 |
Jw. - o pow. ponad 2 m2. SST 02.01
|
|
Okna Ip. pom. 1/2 do 1/9
(2.57*1.62)*8
|
33.31
|
Jm. m2 |
Razem: |
33.31 |
1. 5. |
KNR
04-01-0354-0800 |
Wykucie z muru ościeżnic stal. okien. lub krat stal. okien. o pow. ponad 2 m2. SST 02.01
|
|
Kraty I p. pom. 1/6 do 1/9
(2.50*1.55)*4
|
15.50
|
Jm. m2 |
Razem: |
15.50 |
1. 6. |
KNNR
00-07-0701-0400 |
Okna z tw. sztucz. o pow. do 2,0 m2. SST 03.02
|
|
Okn: Ip. pom. 1/1
1.04*1.64
|
1.71
|
Jm. m2 |
Razem: |
1.71 |
1. 7. |
KNNR
00-07-0701-0500 |
Jw. - o pow. ponad 2,0 m2. SST 03.02
|
|
Okna Ip. pom. 1/2 do 1/9
(2.57*1.62)*8
|
33.31
|
UWAGI: R i S x 1,1 wg pkt. 2.4 zał. szczeg.
|
|
Jm. m2 |
Razem: |
33.31 |
1. 8. |
NNRNKB
02-02-0541-0100 |
Podokienniki zewn. z bl. powlek. o szer. w rozw. do 25cm (cz. VI). SST 03.02
|
|
I p., pom. 1/1 1/2 do 1/5, 1/6 do 1/9
(1.04+(2.57*8))*0.20
|
4.32
|
Jm. m2 |
Razem: |
4.32 |
1. 9. |
KNR
02-02-0129-0200 |
Obsadzenie pref. podokiennik. dł. ponad 1m (anal.). SST 03.02
|
|
Ip., pom. 1/1, 1/2 do 1/9
1+8
|
9.00
|
Jm. szt. |
Razem: |
9.00 |
1.10. |
KNR
04-01-1212-0801 |
Malowanie 2x f. ftal. krat i balustrad z pręt. ozdob. SST 03.35
|
|
Ip., pom. 1/1
1.00*1.60
|
1.60
|
Jm. m2 |
Razem: |
1.60 |
1.11. |
KNR
04-01-0303-0200 |
Uzupełnienie ścianek lub zam. otw. w ściankach z ceg. o gr. 1/2c. na zapr. cem.-wap. z wap. suchogasz.SST 02.04
|
|
Pięrto pom. 1/1 po zlikw. oknie
0.56*0.80
|
0.45
|
Jm. m2 |
Razem: |
0.45 |
1.12. |
KNR
04-01-0709-0500 |
Uzupełnienie tynk. zwyk. wewn. kat. III na ścian. na podł. z ceg., pustak. ceram. i bet. o pow. do 0,5 m2 z zapr. cem.-wap. z ciasta wap. SST 03.16
|
|
Pięrto pom. 1/1 i 1/9 po zlikw. oknie
1.00+1.00
|
2.00
|
Jm. szt. |
Razem: |
2.00 |
2. |
Element: STOLARKA i ŚLUSARKA DRZWIOWA |
|
2. 1. |
KNR
04-01-0354-0400 |
Wykucie z muru ościeżnic drewn. o pow. do 2 m2. SST 02.01
|
|
Drzwi Ip. pom. 1/2 do 1/9
6.00
|
6.00
|
Jm. szt. |
Razem: |
6.00 |
2. 2. |
KNR
04-01-0329-0200 |
Wykucie otw. w ścian. z ceg. o gr. 1/2c. na zapr. wap. lub cem.-wap. dla otw. drzw. SST 02.01
|
|
I p. pom. 1/2, do 1/5, 1/6 do 1/8, 1/9
((1.00*2.05)*4)+((0.20*2.05)*3)+(1.00*0.70)
|
10.13
|
Jm. m2 |
Razem: |
10.13 |
2. 3. |
KNR
04-01-0303-0200 |
Uzupełnienie ścianek lub zam. otw. w ściankach z ceg. o gr. 1/2c. na zapr. cem.-wap. z wap. suchogasz. SST 02.04
|
|
Po zlikw. drzwiach: Pięrto pom. 1/5, 1/9
(0.90+0.80)*2.05
|
3.48
|
Jm. m2 |
Razem: |
3.49 |
2. 4. |
KNR
04-01-0711-0201 |
Uzupełnienie tynk. zwyk. wewn. kat. III na ścian. płask. i słup. prostok. na podł. z ceg., pustak. ceram., gazo- i pianobet. o pow. do 2 m2/m-ce z zapr. cem.-wap. z wap. suchogasz. SST 03.16
|
|
Po zlikw. drzwiach: Pięrto pom. 1/5, 1/9
(0.90+0.80)*2.05*2
|
6.97
|
Jm. m2 |
Razem: |
6.97 |
2. 5. |
ANALIZA WŁASNA |
Montaż dzwi z ościenicami drewnianymi. SST 03.01
|
|
Ip. pom. 1/2 do 1/9
8.00
|
8.00
|
Jm. szt. |
Razem: |
8.00 |
2. 6. |
KSNR
00-07-0505-0200 |
Przegrody alum. lub stal. z prof. cienkościen. powlek. z drzwiami o pow. do 10 m2. SST 03.03
|
|
I p. pom. 1/1
1.70*2.50
|
4.25
|
Jm. m2 |
Razem: |
4.25 |
3. |
Element: ŚCIANY |
|
3. 1. |
ANALIZA WŁASNA |
Demontaż elem. drewn., drewnopodobnych oraz innych elementów wyposażenia. SST 02.01
|
|
Karnisze, żaluzje, szafa, deski odbojowe, ścianki i obudowy g/k wraz z rurami, ścianki drewn.-szkl., elementy drobne
1.00
|
1.00
|
Jm. kpl. |
Razem: |
1.00 |
3. 2. |
KNR
04-01-1208-0200 |
Ługowanie f. olej. z tynk. ścian. SST 02.01
|
|
I p., pom. 1/1
((11.98+1.64+11.98-(1.00*8))*1.40)-(1.04*0.70)+(0.20*0.70*2)-(1.56*0.60)
|
23.26
|
Jm. m2 |
Razem: |
23.26 |
3. 3. |
KNR
04-01-0819-1500 |
Rozebranie wykładz. ścien. z płyt. SST 02.01
|
|
Ip: pom. 1/2, 1/6, 1/7,
((0.95+0.21+0.27+2.62)*1.37)+((1.01+0.15)*1.48)+(1.24*1.40)
|
9.00
|
Jm. m2 |
Razem: |
9.00 |
3. 4. |
KNR
04-01-0354-1200 |
Wykucie z muru półki beton. i z lastryko (anal). SST 02.01
|
|
Ip: pom. 1/2
1.50
|
1.50
|
Jm. m |
Razem: |
1.50 |
3. 5. |
KNR
04-01-0354-1300 |
Wykucie z muru kratek wentylac. lub drzwiczek. SST 02.01
|
|
Ip: pom. 1/1, 1/2, 1/4, 1/6, 1/7, 1/9
6.00
|
6.00
|
Jm. szt. |
Razem: |
6.00 |
3. 6. |
KNR
04-01-0711-0201 |
Uzupełnienie tynk. zwyk. wewn. kat. III na ścian. płask. i słup. prostok. na podł. z ceg., pustak. ceram., gazo- i pianobet. o pow. do 2 m2/m-ce z zapr. cem.-wap. z wap. suchogasz. SST 03.16
|
|
Ip: pom. 1/2, 1/6, 1/7,
((0.95+0.21+0.27+2.62)*1.37)+((1.01+0.15)*1.48)+(1.24*1.40)
|
9.00
|
Jm. m2 |
Razem: |
9.00 |
4. |
Element: ELEMENTY G/K |
|
4. 1. |
KNR
00-14-2010-0200 |
Ścianki dział. GR z płyt g/k GKF na ruszt. metal. z pokryc. obustronnym, jednowarstw. 75 - 101. SST 03.08
|
|
Ip: pom. 1/2, 1/4
(5.85*2.70)*2
|
31.59
|
Jm. m2 |
Razem: |
31.59 |
4. 2. |
KNR
00-14-2011-0100 |
Obudowa elem. konstr. płyt. g/k na ruszt. metal. pojed. jednowarstw. 50 - 01 SST 03.08
|
|
Piętro i parter: obudowy pionów wod.-kan., zabudowy wnęk nad drzwiami, itp.
1.50
|
1.50
|
Jm. m2 |
Razem: |
1.50 |
5. |
Element: PRACE WYKOŃCZENIOWE |
|
5. 1. |
NNRNKB
02-02-1134-0201 |
Gruntowanie podłoży preparatem "ATLAS UNI GRUNT" - sufity (cz.VII + errata KwB 1/98 str. 156 - k.ind.). SST 03.16
|
|
Ip: pom. 1/1 do 1/9
20.23+16.15+16.91+16.85+16.15+10.27+10.29+10.66+10.59
|
128.10
|
Jm. m2 |
Razem: |
128.10 |
5. 2. |
NNRNKB
02-02-1134-0201 |
Gruntowanie podłoży preparatem "ATLAS UNI GRUNT" - pow. pion. (cz.VII + errata KwB 1/98 str. 156). SST 03.16
|
|
I p., pom. 1/1
((11.98+1.64+11.98)*2.60)-((1.00*1.90)*8)
|
51.36
|
pom. 1/2
((2.76+5.85+2.76)*2.60)-(1.00*1.90)-(2.57*1.62)+((1.62+2.57+1.62)*0.08)
|
23.96
|
pom. 1/3
((2.88+5.85+2.88)*2.60)-(1.00*1.90)-(2.57*1.62)+((1.62+2.57+1.62)*0.08)
|
24.59
|
pom. 1/4
((2.88+5.85+2.88)*2.60)-(1.00*1.90)-(2.57*1.62)+((1.62+2.57+1.62)*0.08)
|
24.59
|
pom. 1/5
((2.76+5.85+2.76)*2.60)-(1.00*1.90)-(2.57*1.62)+((1.62+2.57+1.62)*0.08)
|
23.96
|
pom. 1/6
(((3.89+2.58)*2)*2.60)-(1.00*1.90)-(2.57*1.62)+((1.62+2.57+1.62)*0.08)
|
28.05
|
pom. 1/7
(((3.89+2.69)*2)*2.60)-(1.00*1.90)-(2.57*1.62)+((1.62+2.57+1.62)*0.08)
|
28.62
|
pom. 1/8
(((3.89+2.75)*2)*2.60)-(1.00*1.90)-(2.57*1.62)+((1.62+2.57+1.62)*0.08)
|
28.93
|
pom. 1/9
(((3.89+2.75)*2)*2.60)-(1.00*1.90)-(2.57*1.62)+((1.62+2.57+1.62)*0.08)
|
28.93
|
Jm. m2 |
Razem: |
262.99 |
5. 3. |
NNRNKB
02-02-2015-0100 |
Gładzie gips. j/w-wowe gr. 3mm na strop. o pow. ponad 5 m2 na podł. z tynku (cz. X). SST 03.16
128.10
|
128.10
|
Jm. m2 |
Razem: |
128.10 |
5. 4. |
NNRNKB
02-02-2013-0100 |
Gładzie gips. j/w-wowe gr. 3mm na ścian. na podł. z tynku w pom. o pow. podłogi ponad 5 m2 (cz. X). SST 03.16
262.99
|
262.99
|
Jm. m2 |
Razem: |
262.99 |
5. 5. |
KNR
02-02-1505-0300 |
Malowanie 2x f. emuls. podł. gips. wewn. z grunt. SST 03.35
128.10+262.99
|
391.09
|
Jm. m2 |
Razem: |
391.09 |
5. 6. |
KNR
02-02-1505-0700 |
Malowanie 2x f. emuls. such. tynk. wewn. z grunt. SST 03.35
|
|
Ip: pom. 1/2, 1/4
(5.85*2.70)*2*2
|
63.18
|
Jm. m2 |
Razem: |
63.18 |
5. 7. |
KNR
04-01-1212-1900 |
Malowanie 2x f. olej. grzejnik. radiator. SST 03.35
|
|
Ip: pom. 1/1, 1/3, 1/4, 1/5, 1/6, 1/7, 1/8, 1/9
(0.15*0.60*2)*(5+14+13+12+17+11+10+13)
|
17.10
|
Jm. m2 |
Razem: |
17.10 |
5. 8. |
KNR
04-01-1212-2801 |
Malowanie 2x f. ftal. rur wodoc. o śr. do 50mm. SST 03.35
|
|
Ip. pom. 1/1, 1/3, 1/4, 1/5, 1/6, 1/7, 1/8, 1/9
((2.70*3)+(0.40*2))+((2.70*2)+(0.40*2))+(0.20*2)+((2.70*2)+(0.30*2))+(0.20*2)+(0.30*2)+(0.20*2)+(0.30*2)
|
23.50
|
Jm. m |
Razem: |
23.50 |
6. |
Element: PODŁOGI |
|
6. 1. |
KNR
04-01-0804-0800 |
Zerwanie cokol. cem. SST 02.01
|
|
Parter pom. 0/1 (anal), 0/4 i 0/7,
(2.96+0.40+0.27+0.21+0.25+0.82+0.13+0.57+0.40+0.38+1.30+(1.88-0.97)+0.19+0.23)+((((5.94+0.42+3.74+0.60)*2)+1.48)-(0.80*5)-(0.90*2)-1.00)
|
25.10
|
pom. 0/13 (anal), 0/14 (anal), 0/15
(((3.65+2.70)*2)-0.80)+(((2.66+3.83)*2)-0.90)+(4.28+1.24+4.28+0.06-1.00-0.70-0.90)
|
31.24
|
Jm. m |
Razem: |
56.34 |
6. 2. |
KNR
04-01-0815-0800 |
Demontaż listew przyściennych z drewna liściastego (k.ind.). SST 02.01
|
|
Parter pom. 0/3, 0/12, 0/20, 0/19 do 0/25
((2.64*4)+(3.19*2)+(2.41*2)-(0.90*3))+(((3.80+2.76)*2)-0.80)+(((3.85+2.62)*2)-(0.90*2))+(((11.76+8.35+4.30+0.14)*2)-(1.40-0.90))
|
91.12
|
UWAGI: R x 0,37 wg OKRB WACETOB zeszyt 10/90 - pyt. 53
|
|
Jm. m |
Razem: |
91.12 |
6. 3. |
KNR
04-01-0818-0500 |
Zerwanie posadz. z tw. szt. SST 02.01
|
|
Piętro pom. 1/6, 1/7, 1/8, 1/9
((2.73*3.87)-(3.10*0.14)-(0.21*0.27)-(0.74*0.15))+((2.69*3.87)-(0.34*0.52))+(2.70*3.76)+((2.67*3.76)-(0.53*0.21))
|
40.28
|
Jm. m2 |
Razem: |
40.28 |
6. 4. |
ANALIZA WŁASNA |
Posadzka z wykł. Tarket na przygot. podłożu wraz z cokolikami. SST 03.30
|
|
Ip: pom. 1/1 do 1/9
20.23+16.15+16.91+16.85+16.15+10.27+10.29+10.66+10.59
|
128.10
|
Jm. m2 |
Razem: |
128.10 |
7. |
Element: INSTALACJA WOD.-KAN. |
|
7. 1. |
KNR
04-02-0132-0100 |
Demontaż baterii umywalkowej i zmywakowej. SST 10.01
|
|
Ip: pom. 1/2, 1/6, 1/7
3.00
|
3.00
|
Jm. szt. |
Razem: |
3.00 |
7. 2. |
KNR
04-02-0235-0600 |
Demontaż umywalki SST 11.01
|
|
Ip: pom. 1/6, 1/7
2.00
|
2.00
|
Jm. kpl. |
Razem: |
2.00 |
7. 3. |
KNR
04-02-0235-0400 |
Demontaż zmywaka kuchennegoSST 11.01
|
|
Partet: pom. 0/11
1.00
|
1.00
|
Jm. kpl. |
Razem: |
1.00 |
8. |
Element: INSTALACJA C.O. |
|
8. 1. |
KNR
04-02-0512-0100 |
Demontaż zaw. grzejnik. lub dwuzłącz. fi 15-20mm. SST 12.04
|
|
Ip: pom. 1/1, 1/3, 1/4, 1/5, 1/6, 1/7, 1/8, 1/9
8.00
|
8.00
|
Jm. szt. |
Razem: |
8.00 |
8. 2. |
KNR
02-15-0422-0101 |
Rury przyłączne fi 15mm do grzejników c.o. SST 12.04
|
|
Ip: pom. 1/2
1.00
|
1.00
|
Jm. kpl. |
Razem: |
1.00 |
8. 3. |
KNR
00-31-0208-0100 |
Zawory grzejnik. termostat. o podwój. regulac. proste lub kątowe z głowic. termostat. śr. 15 mm. SST 12.04
|
|
Ip: pom. 1/1, 1/2, 1/3, 1/4, 1/5, 1/6, 1/7, 1/8, 1/9
9.00
|
9.00
|
Jm. kpl. |
Razem: |
9.00 |
8. 4. |
KNR
00-31-0205-0500 |
Grzejniki stal. panel. C.600/2500 mm montowane na ścianie SST 12.04
|
|
Ip: pom. 1/2
1.00
|
1.00
|
Jm. szt. |
Razem: |
1.00 |
8. 5. |
KNR
02-15-0404-0100 |
Próba ciśn. szczeln. instal. wewn. c.o. w bud. mieszk. SST 12.04
|
|
Ip: pom. 1/2
1.00
|
1.00
|
Jm. urządzenie |
Razem: |
1.00 |
9. |
Element: WYWÓZ GRUZU |
|
9. 1. |
KNR
04-01-0108-1100 |
Wywiezienie gruzu spryzm. sam. samowyład. do 5t na odl. do 1km. SST 02.01
|
|
Beton poz. 1.2, 3.4
(22.48*0.36*0.06)+(1.50*0.23*0.05)
|
0.50
|
Drewno poz. 2.1
(0.80*2.00*0.03)*6
|
0.29
|
Cegła poz. 2.2
10.13*0.16
|
1.62
|
Zapr. cem. poz. 6.1
56.34*0.10*0.015
|
0.08
|
Wykładz. dywan. poz. 6.3
40.28*0.003
|
0.12
|
Pozostałe
0.3
|
0.30
|
Glazura poz. 3.3
9.00*0.02
|
0.18
|
Jm. m3 |
Razem: |
3.09 |
9. 2. |
KNR
04-01-0108-1200 |
Jw. - dodatek za nast. 9km. SST 02.01
2.71
|
2.71
|
Jm. m3 |
Razem: |
2.71 |
9. 3. |
ANALIZA WŁASNA |
Koszty utylizacji gruzu na wysypisku.
|
|
Beton (*T/m3)
0.50*2.2
|
1.10
|
Drewno
0.29*0.7
|
0.20
|
Cegła
1.62*1.8
|
2.92
|
Zapr. cem.
0.08*1.9
|
0.15
|
Wykładz. dywan.
0.12*1.2
|
0.14
|
Pozostałe
0.30*0.5
|
0.15
|
Glazura
0.18*2.15
|
0.39
|
Jm. t |
Razem: |
5.05 |